Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

CFEC - Central Florida Electric Cooperative

Florida Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Rebates Offered
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Electric Service Reqs

**Disconnect: **


* install and maintain a manual disconnect switch of the visible load break type to provide a separation point between the AC power output of the SPS and any Customer facilities connected to the Cooperative's electrical system.

* The manual disconnect switch shall be mounted separate from the meter socket and shall be readily accessible at all times to the Cooperative and shall be capable of being locked in the open position by the Cooperative.


**Equipment Certifications: **


* Customer shall, prior to connection and operation, provide equipment specifications to the Cooperative identifying and certifying in writing that the SPS, Inverters and associated equipment design, installation and operation adheres to IEEE-1547 Standards, UL-1741 Standards, the National Electric Code, and has been approved by the Florida Solar Energy Center (FSEC Std 203-05).

Website
link
Phone
(844) 434-3962

Other details

Restrict Inspection
0
Address ID
108138
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with CFEC - Central Florida Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.