CHELCO - Choctawhatchee Electric Cooperative

Florida Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Net Excess Generation Notes

The customer’s bill will be calculated by subtracting the credit to the customer from the Cooperative’s charges to the customer. If the credit to the customer is greater than the Cooperative’s charges to the customer, the customer’s bill shall be zero for the current billing cycle with the difference credited to the customer in subsequent billing cycles. When the customer discontinues Net Metering Rate service, any unused credit will revert to the Cooperative. 

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Install Reqs

CHELCO inspection of generation system is required prior to completing interconnection. Without a properly programmed meter, energy intended as sold to CHELCO will appear on member’s billing as energy usage, billed to a member with no way of separating used and sold energy.

Rate Schedule Link
link
Website
link
Phone
(850) 892-2111

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
0
Address ID
108136
Express Planset Eligible
Yes