City of Blountstown
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Meter readings shall be taken monthly. Excess generation shall be purchased by the city in the form of a credit on the customers bill. Each billing cycle, customer shall be credited for any excess energy generated. This credit will be in accordance with the avoided energy cost. Credit for excess generation produced shall accumulate and be applied to the customers consumption bill through the end of the calendar year. In the last billing cycle of the year, any remaining account credit balance will be paid by the city to the customer. The city will issue an IRS 1099-MISC form totaling all monthly credits for the previous year to customers with total credits of $600 or greater.
- Rebates Offered
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard - See uploaded example
- Electric Service Reqs
IEEE 1547
UL 1741
- Install Reqs
AC Disconnect Required
- Must be a manual disconnect switch of the visible load break type to provide separation point between the AC power output of the system and the cities wiring
- Must be readily accessible to the utility and capable or being locked in the open position
PV Meter Required (installer to provide socket)
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
Other details
- Revision Required
- 1
- Address ID
- 10384075
- Express Planset Eligible
- No