Clewiston Utilities
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The customer will be billed for the total amount of electricity delivered to the home by the utility. The customer will then be credited for the total amount of excess electricity that is generated by the customer and delivered to the utility. In the event that a customer’s credit for its self-generation is greater than its bill for utility electricity, the excess credit amount will be applied to the following month’s bill. The customer’s monthly bill will reflect the net of electricity purchased from the utility versus electricity sold to the utility.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- System Offset Notes
For inverter-based systems, the AC nameplate generating capacity shall be calculated by multiplying the total installed DC nameplate generating capacity by 0.85 in order to account for losses during the conversion from DC to AC.
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
Temporary Disconnect Reconnect Process (TDR) The member needs to be the one to call and request a cutloose/reconnect - we need a 24 hour notice. And will require an inspection receipt from the county before we reconnect. "Permits have to be pulled prior to any work being done (Community Development )
Before we can reconnect service the City Inspector has to check and approve work
We are short staffed so the sooner you can notify us the better that way we can assure no delays"
TDR - Who to Contact Customer Service
TDR - Applications/Documents Req No No
TDR - ETA of notice required for request 24 hours 48 hours
TDR - Who can schedule? Customer Does not matter
TDR - ETA of Utility Scheduling TDR N/A N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
See Plan Sample
- SLD Reqs
See Plan Sample
- Install Reqs
The manual disconnect switch shall be mounted separate from the meter socket on an exterior surface adjacent to the meter.
- Placards
Required
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (863) 983-1454
Other details
- Restrict Inspection
- 0
- Address ID
- 270875
- Express Planset Eligible
- Yes