FPL - Florida Power & Light
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
NEM TypeAnnual
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes
MPU Rules<p><br></p>
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Annual
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- N/A
- Net Excess Generation Notes
- Customer net excess generation (NEG) is carried forward as a kilowatt-hour credit to customers’ next bill for up to 12 months.
- At the end of the 12 month billing period, the utility pays the customer for any remaining NEG at the utility’s avoided-cost rate, typically $.02-$.04/kWh.
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Supply Side Taps Allowed
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- Yes
- Tap Criteria
- No tap in meter can
- MPU Rules
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Percentage
- Offset Value
- 115
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
- If the system size exceeds 115% of the customer’s last 12 months of usage, a Load Justification Form is required; EV chargers require proof and cannot use a Load Justification Form
- For new construction, a load calculation must be included in the permit package
- If there is no historical usage, use previous occupant usage data or PV Watts
- System Size Justification
- Load Justification
- System Offset Notes
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- SLD Reqs
Include three line diagram and single line diagram in planset.
- Electric Service Reqs
- Placards
- Electrical Stamp Required
- No
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Site Plan Notes
All Jobs [PV DISCONNECTING MEANS WILL BE INSTALLED ADJECENT TO FPL METER AND HAVE 24/7 ACCESS TO FPL PERSONNEL]
- Label Page Notes
- Cover Page Notes
- Electrical Diagram Notes
All Jobs [PV DISCONNECTING MEANS WILL BE INSTALLED ADJECENT TO FPL METER AND HAVE 24/7 ACCESS TO FPL PERSONNEL]
- Rate Schedule Link
- link
- Website
- link
- Phone
- (888) 988-8249
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- No