JEA - Jacksonville Electric Authority
Net Metering Allowed0
NEM TypeN/A
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- N/A
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.03
- Solar Export Rate Approx
- 0.03
- Solar Export Value Notes
- Export rate = variable fuel rate
- Rebates Offered
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Tap Criteria
Taps
- NO TAP IN METER UNLESS DUAL LUG
- UTILIZE POLARIS LUGS FOR TAPS NO PIERCING TAPS ALLOWED
- Tap boxes are not allowed
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
- System size limited to 90% of the capacity of the JEA equipment providing service to the premises.
- Inverter Oversize Restrictions
- 0
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Required
- 1
- Meter Spot Process
- Call JEA Customer Service at to schedule disconnect/reconnect. There is no charge for this action. You will need to follow permit requirements. If only need is to break seal and remove the meter to isolate the circuit breaker panel, permit is required in place with the city/inspection agency.
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
AC Disconnect
- DISCONNECT REQUIRED BETWEEN MID AN POI
- PV Only: Label as (N) GENERATION DISCONNECT EATON _______ (OR EQUIVALENT)
- Battery Projects: Each battery will require its own AC Disconnect grouped with the PV disconnect. Label as (N) BATTERY DISCONNECT EATON _______ (OR EQUIVALENT)
EXISTING SYSTEMS
- Pitch and azimuth of the existing system on the property need to be reflected on planset
- SLD Reqs
- Electric Service Reqs
Meter Can
- JEA does not allow coupler or splices to be installed on the conductor in the meter can.
- JEA will allow the landing of secondary conductors via approved terminating lugs on the load side of the meter in accordance with NEC and the local inspection authority.
- Placards
- Electrical Stamp Required
- 0
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Site Plan Notes
- Electrical Diagram Notes
All Jobs [DISCONNECTING MEANS TO BE INSTALLED WITHIN 5FT OF UTILITY METER // AC DISCONNECT TO BE separate, external, accessible, knifeblade, lockable with a JEA padlock]
- Rate Schedule Link
- link
- Website
- link
- Phone
- (904) 665-6000
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Address ID
- 108128