Lake Worth Beach Electric Utility
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Size Justification
- Load Justification
- System Offset Notes
- Load Justification Form required on All projects
- We only allow installations up to 10KW Max.
- The system can’t produce more KWH’s than the property consumed for the previous 12 months
- The GPR shall not exceed ninety percent (90%) of the Customer’s electric distribution service rating. If the GPR does exceed the ninety percent (90%) limit, the Customer shall be responsible for all costs associated with upgrading the distribution service to ensure the ninety percent (90%) limit is not exceeded.
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Website
- link
- Phone
- (561) 533-7300
Other details
- Restrict Inspection
- 0
- Address ID
- 136325
- Express Planset Eligible
- Yes