WREC - Withlacoochee River Electric Cooperative, Inc

Florida Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes

Net metering & export

Net Metering Allowed
Yes
Post Solar Billing Method
Net Metering
Rebates Offered
No
Allows Standby
Yes

Interconnection & taps

Approval Req To Install
No
Supply Side Taps Allowed
Yes
Line Taps Allowed
Yes
Load Taps Allowed
Yes
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

The max system size for a Tier 1 application is 11.76 kW DC

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Site Plan not required for Interconnection submittal

SLD Reqs

Detailed Solar System One-Line Drawing


_ Engineering quality drawing in PDF format. (No hand drawn One-Line diagrams or photographs will be accepted). _


* Electrical Diagram for the RGS System (document sent to the county for permitting).

* The number of solar panels and the size of each panel. o If the RGS is a wind turbine the size of the system.

* If a Battery Backup system is installed, the electrical interconnect, the size of the batteries and quantity. The interconnect should also be IEEE-1547/UL-1741 compliant.

Electric Service Reqs

**System Sizing**

The Gross DC and AC Power Ratings in Kilowatts (KW), and the estimated Annual KWh (Kilowatt-hour). The output of the system will be calculated by the Application form.

Website
link
Phone
(352) 567-5133

Other details

Revision Required
No
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with WREC - Withlacoochee River Electric Cooperative, Inc before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.