City of Fairburn
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- No
- TOU Utility
- No
- Net Excess Generation Notes
No solar program, customer can install solar if it doesn't negatively affect the utility grid. Electricity generated from the solar will either be consumed or exported instantaneously. Exported kWh to the grid will not be compensated.
- Rebates Offered
- No
- Deregulated
- Yes
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- No
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Rate Schedule Link
- link
- Website
- link
- Phone
- (770) 964-2244
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes