Cobb EMC
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Solar Export Rate
- 0.04
- Solar Export Rate Approx
- 0.04
- Solar Export Value Notes
- Last updated 3/10/21 per https://cobbemc.com/sites/cobbemc/files/Current%20Site%20PDFs/Rates-Residential/2021/Rate-Schedule-DG-1-01.27.2021.pd
- Net Excess Generation Notes
When the electricity generated by the Member Generator’s Distributed Generation Facility exceeds the electricity supplied by the Cooperative during the Billing Period, the Member Generator shall receive a bill credit for the Excess Net Energy pursuant to the Cooperative’s Distributed Generation Service Schedule, DG-l.
Selected NEM because there is 1 bi-directional meter reading forward and backwards energy and energy is netted on a monthly basis and not instantaneously
- Rebates Offered
- 0
- Deregulated
- 1
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 2
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
Temporary Disconnect Reconnect Process (TDR): Call southern Rivers 1-3 days in advance to schedule the temporary disconnect.
TDR - Who to Contact: Energy a past project Mason:
TDR - Applications/Documents Req: No Applications/Contracts
TDR - ETA of notice required for request: 1 week notice
TDR - Who can schedule? Does not matter
TDR - ETA of Utility Scheduling TDR: 1 week
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Not Required
- SLD Reqs
Lineside Taps Allowed, but not in meter can
- Placards
Must follow all AHJ Regulations. Utility did not have specific placard requirements
- Equipment Approvals
- California Energy Commission
- Rate Schedule Link
- link
- Website
- link
- Phone
- (770) 429-2100
Other details
- Restrict Inspection
- 0
- Address ID
- 194924
- Express Planset Eligible
- Yes