Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Colquitt EMC

Georgia Utility Interconnection & net metering rules
Net Metering Allowed0
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed1

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.038
Solar Export Value Notes
per kWh
Net Excess Generation Notes

All energy consumed by the Customer Generator will be charged under the applicable retail rate, the generated energy fed into the cooperatives electric grid will be purchased by the Cooperative at the Cooperative’s avoided average annual cost of purchased power as provided under the Purchase Rate section of this Rider.

The rate used to determine the dollar amount paid for energy purchased by the Cooperative shall be based upon the Cooperative’s avoided average annual cost of purchased power.

The Cooperative will purchase energy from Customer Generators on a first-come, first-served basis only until the cumulative generating capacity of all the Customer Generator’s renewable resources equals 0.2 percent of the Cooperative’s annual peak demand in the previous year. 

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
1
Tap Criteria

Line side connections are not allowed

Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes
  • Max system size: 10.00 kW AC
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  •  Lockable air-break disconnect or lockable drawout circuit breaker required
SLD Reqs
  • Lockable air-break disconnect or lockable drawout circuit breaker required
Website
link
Phone
(229) 985-3620

Other details

Restrict Inspection
0
Address ID
209147
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Colquitt EMC before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.