Crisp County Power
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Other
- Net Excess Generation Notes
Any energy which is generated that is in excess of the customer load at any time shall be purchased by the Crisp County Power Commission at the Power Commission’s estimated average marginal energy cost.
- Rebates Offered
- No
Interconnection & taps
- Approval Req To Install
- No
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Website
- link
- Phone
- (229) 273-3811