Diverse Power
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.03
- Net Excess Generation Notes
The rate used to determine the dollar amount paid for net energy purchased by the Cooperative shall be based upon the Cooperative’s avoided average annual cost of purchased power. The purchase rate as of the effective date of this Rider shown below is: All kWh $0.031 per kWh
However, the Cooperative will only be required to purchase such energy from Customer Generators on a first-come, first-served basis until the cumulative generating capacity of all the Customer Generators’ renewable energy resources equals 0.2 percent of the Cooperative’s annual peak demand in the previous year.
- Rebates Offered
- 0
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Process
TDR - Process: Per Diverse Power "Have electrician contact customer service. Allow a couple of days notice. Should be hooked back up when upgrade complete."
TDR - Who to contact them
TDR - Applications/Documents Req: None
TDR - ETA of notice required for request: 3-5 business days
TDR - Who can schedule? : Forever
TDR - ETA of Utility Scheduling TDR: Unknown
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
"a detailed one-line diagram of the proposed facility, all applicable elementary diagrams, major equipment, (generators, transformers, inverters, circuit breakers, protective relays, etc.) specifications, test reports, etc., and any other applicable drawings or documents
necessary for the proper design of the interconnection. Also describe the project’s planned operating mode (e.g., combined heat and power, peak shaving, etc.)."
- Electric Service Reqs
- Electrical Stamp Required
- 1
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (706) 845-2000
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 209157
- Express Planset Eligible
- Yes