GA - Blue Ridge Mountain EMC

Georgia Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
No
TOU Utility
No
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Value Notes
"Super Peak kilowatthours per month at 2.188 cents per kWh. On Peak kilowatthours per month at 2.137 cents per kWh. Off Peak kilowatthours per month at 1.895 cents per kWh. Super Off Peak kil
Net Excess Generation Notes

Power purchased through Tennessee Valley Authority. Electricity produced serves the facility's needs first. TVA purchases any excess generation that is delivered to the grid. If the facility needs additional electricity, it must be bought from the local power company. Bi-directional meter that is capable of recording kW/kWh received from the local power company and delivered to the power grid on separate channels is required.


After project received PTO from Blue Ridge Mountain EMC, customer can apply for an Export OR Feed-in-Tariff option with TVA (energy supplier of Blue Ridge Mountain EMC). Additional equipment/metering may be required. If the customer doesn't apply to the TVA, then they'll have a non-export system.

Rebates Offered
No
Deregulated
No
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Website
link
Phone
(706) 379-3121

Other details

Revision Required
Yes
Mod Swap Requires Planset
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with GA - Blue Ridge Mountain EMC before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.