Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
Yes
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The purchase rate for a DG facility rated 10kW or less as of the effective date of this Rider is: All kWh $0.060 per kWh. The purchase rate for a DG facility rated greater than 10kW up to 100kW as of the effective date of this Rider is: All kWh $0.035 per kWh

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
Yes

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Site Information, Solar Array Information, Disconnect Locations, Wiring Sizes.