Mitchell Electric Member Corp

Georgia Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Feed-in-Tariff
Solar Export Type
Avoided Cost
Net Excess Generation Notes

The Cooperative will make metering available to the Member Generator using bi-directional metering orsingle-direction metering as provided in O.C.G.A.§46-3-54 and 55, and shall purchase power from theMember as provided in this Agreement. The Member may purchase power from the Cooperative and theCooperative shall supply such power or electrical service on the same terms and conditions as it is suppliedto other members of the Cooperative.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

10kw AC Max system size

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Website
link

Other details

Restrict Inspection
0
Address ID
929178
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Mitchell Electric Member Corp before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.