Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

OREMC - Okefenoke Rural Electric Membership Corporation

Georgia Utility Interconnection & net metering rules
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Rebates Offered
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
250
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Has a capacity rating of no greater than 250 kW (AC).

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

AC Disconnect must be within 6ft of Meter

Equipment Approvals
California Energy Commission
Website
link
Phone
(800) 262-5131

Other details

Restrict Inspection
0
Address ID
117996
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with OREMC - Okefenoke Rural Electric Membership Corporation before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.