Planters EMC
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correctionNet metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.04
- Net Excess Generation Notes
If the electricity consumed by the Member Generator at any point during the billing period exceeds the electricity generated by the Member’s distributed generation facility at the same point in time, then all electricity generated by the Member generator shall be deemed to have been used by the Member. If the electricity generated by the Member’s distributed generation facility at any point during the billing period exceeds the electricity consumed by the Member Generator at the same point in time, then such excess net energy shall be purchased by the Cooperative as All kWh $0.040 per kWh
- Rebates Offered
- No
- Deregulated
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
All major electrical equipment that is pertinent to understanding the normal and contingency operations of the Member Generator’s DG Facilities, including generators, switches, circuit breakers, fuses, protective relays and instrument transformers.
- Website
- link
- Phone
- (478) 982-4722
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes