Satilla REMC
Net metering & export
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.04
- Net Excess Generation Notes
For any given hour, if the electricity generated by the Member's Distributed Generation Facility exceeds the electricity consumed by the Net Billing Customer, then Excess Net Energy is available to the Cooperative.
The sum of all Excess Net Energy during the Billing Period shall be purchased by the Cooperative at the rate and under the conditions as provided under the Energy Purchase Rate of the Cooperative's Distributed Generation Net Billing Service Rider.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Distributed Generation Facility used by a residential customer shall not exceed a nominal 10 kW and the capacity of a Distributed Generation Facility used by a non-residential customer.
Metering & disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Disconnect should be spaced far enough from meter base to allow safe opening and closing of meter base, but no more than 6 ft. away from meter base.
- SLD Reqs
- Production Meter is not required.
- The one-line diagram must show, at minimum, any devices such as the service panel, disconnect switch, inverters, all generators, circuit breakers, etc. associated with the application's generating facilities and its interconnection to Satilla REMC's distribution system.
- Placards
All devices must be labeled with the electrical ratings (amps, volts, etc.) in accordance with the latest version of the NEC.
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (888) 738-6926
Other details
- Restrict Inspection
- 0
- Address ID
- 209230
- Express Planset Eligible
- Yes