Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Satilla REMC

Georgia Utility Interconnection & net metering rules
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.04
Net Excess Generation Notes

For any given hour, if the electricity generated by the Member's Distributed Generation Facility exceeds the electricity consumed by the Net Billing Customer, then Excess Net Energy is available to the Cooperative.

The sum of all Excess Net Energy during the Billing Period shall be purchased by the Cooperative at the rate and under the conditions as provided under the Energy Purchase Rate of the Cooperative's Distributed Generation Net Billing Service Rider.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Distributed Generation Facility used by a residential customer shall not exceed a nominal 10 kW and the capacity of a Distributed Generation Facility used by a non-residential customer.

Metering & disconnect

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Disconnect should be spaced far enough from meter base to allow safe opening and closing of meter base, but no more than 6 ft. away from meter base.

SLD Reqs
  • Production Meter is not required.
  • The one-line diagram must show, at minimum, any devices such as the service panel, disconnect switch, inverters, all generators, circuit breakers, etc. associated with the application's generating facilities and its interconnection to Satilla REMC's distribution system.
Placards

All devices must be labeled with the electrical ratings (amps, volts, etc.) in accordance with the latest version of the NEC.

Equipment Approvals
California Energy Commission
Website
link
Phone
(888) 738-6926

Other details

Restrict Inspection
0
Address ID
209230
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Satilla REMC before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.