Sumter EMC

Georgia Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedNo
Supply Side Taps AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
No
TOU Utility
No
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Net Excess Generation Notes

The rates paid or credited to the Member Generator for net energy purchased by the Cooperative shall be based upon the Cooperative’s avoided cost of energy. The avoided cost of energy shall be applied monthly at the rate of $0.04055 per kWh.

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes


Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

SLD Reqs


Install Reqs

The Member Generator must install a UL approved, visible load break Isolation Disconnect Switch, per NEC Article 705 and additional requirements as set by the Cooperative and stated below, at the Member Generator's expense. In all cases, the Member Generator shall pay the full cost of the installation of the Isolation Disconnect Switch

2. The Isolation Disconnect Switch will be, at all times, readily accessible to the Cooperative's personnel, and in a location acceptable to both the Member Generator and the Cooperative.

3. The Isolation Disconnect Switch shall be capable of being secured in an open position by a lock owned by the Cooperative. If the Cooperative has locked the Isolation Disconnect Switch open, the Member Generator shall not operate or close the Isolation Disconnect Switch.

Electrical Stamp Required
No
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Rate Schedule Link
link
Website
link
Phone
(229) 924-8041
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Sumter EMC before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.