Tri-County EMC (GA)
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.05
- Net Excess Generation Notes
. For each billing period, the member’s monthly energy consumption and generation will be metered. The cumulative kWh Delivered to the member will be metered separately from the kWh Received to the grid from the member. All Delivered kWh will be charged according to the applicable rate schedule and Received energy for that billing period will be credited by an amount per kilowatt-hour at the Cooperative’s Value of Renewable Generation as determined in accordance with Exhibit A (“Excess Energy Credit”).
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- Website
- link
- Phone
- (478) 986-8100
Other details
- Restrict Inspection
- 0
- Address ID
- 209517
- Express Planset Eligible
- Yes