KEC - Kootenai Electric Cooperative

Idaho Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeMonthly
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Any member generation in excess of their monthly kWh consumption will accumulate as “banked” kWh credits. During months in which a member’s consumption exceeds the amount generated, available banked kWh credits will be deducted from their account. Once depleted, remaining energy consumption will be billed at the energy rates established by this schedule. Banked energy credits will be available until consumed.

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
Yes
Line Taps Allowed
Yes
Load Taps Allowed
Yes
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Pushing kW over the rated transformer/secondary/primary equipment at the location is not permitted. As addressed in other questions, upgrades or modifications to KEC equipment that are needed as a result of the solar install are the responsibility of the member and must be paid in full prior to KEC performing any work or approving final interconnection. Installations are intended to be sized and installed for the express purpose of partially or fully supplying the member’s energy requirements at the location being net metered.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

"System sizing

Location of system

Location of disconnect

Location of panels

Model of inverter along with standards it is built for "

SLD Reqs

"System sizing

Location of system

Location of disconnect

Location of panels

Model of inverter along with standards it is built for "

Electric Service Reqs

Transformer Upgrade: Varies, If upgrades or modifications to KEC equipment are needed the member will be notified of the associated costs (vary based on actual job) and required to make payment in full prior to KEC performing any work.

Once payment is made then the work is schedule.

Install Reqs

Member’s DG Resource shall have a disconnect switch mounted to an exterior wall, preferably next to KEC's power meter, that is readily accessible, visible, and lockable in the open position only. This switch, when locked in the open position for any of the following conditions, may be unlocked only by KEC personnel.

Placards

Placards required by NEC

Website
link
Phone
(208) 765-1200