Lower Valley Energy
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correctionNet metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Annual
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
We bank all extra they produce over usage each month and pay back at our cost closing the account to zero on January 1st. If the electricity generated by the Customer exceeds that supplied by LVE, then the Customer shall be paid by LVE for the amount of excess kilowatt-hours generated by Customer over that supplied by LVE
- Rebates Offered
- No
- Deregulated
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Supply Side Taps Allowed
- No
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- No
- System Offset Notes
Allow net metering up to 25KW
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Shows design and components
- SLD Reqs
Standard one line diagram for solar projects. One-Line Drawings, with design and components list
AC Disconnect must be within 3 feet of the meter base.
- Install Reqs
An approved meter base is required for the net meter. If the customer installs a separate meter in their system that will fall under the jurisdiction of the city electrical inspector.
- Placards
Placards required by NEC
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (307) 887-4509