United Electric Cooperative, Inc. (ID)
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.3768
- Net Excess Generation Notes
Member generation in excess of monthly energy usage, measured in kilowatt-hours (kWh) multiplied by the Net Metering Energy Rate, will be carried forward on a monthly basis as a generation credit and will be applied to the member’s monthly billed Energy Charge. This credit can be carried forward up to twelve (12) consecutive months, ending on the Net Metering year as determined by United Electric. At the end of the Net Metering year any remaining accumulated generation credit shall be given to United Electric without compensation to the member.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
They recently changed it to 100% offset OR up to 25 kW (whichever is less).
TDR Process We require a temporary disconnect connected to or integrated into the meter base. It must be properly labeled. I believe this will be required to pass the state inspection.
TDR - Who to Contact N/A
TDR - Applications/Documents Req N/A
TDR - ETA of notice required for request N/A
TDR - Who can schedule? Does not matter
TDR - ETA of Utility Scheduling TDR N/A
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
The utility will install and seal the Net Meter at the time of Final inspection by the utility
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
One-Line needs to show the equipment connected to our service. Provide what you typically provide and we will let you know if more is required
- Electric Service Reqs
If we determine that a transformer upgrade is needed we will provide the new transformer as part of the service.
- Install Reqs
Typically we require a 4 terminal meterbase rated for the service size, it can have a separate or integrated disconnect (Meter Main)
- Rate Schedule Link
- link
- Website
- link
- Phone
- (208) 679-2222
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Address ID
- 277725
- Express Planset Eligible
- Yes