Ameren Illinois

Illinois Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
N/A
Net Excess Generation Notes

For applications after January 1, 2025, excess generation will be credited to the bill's Supply section. These credits will not expire and will carry over until they are used. When applying for net metering, the applicant will need to choose between two methods:

  • kWh Yes - (kWh Usage Netting): On-site excess generation (including prior carryover kWh) will net from Total kWh in calculating Supply Net Total kWh and Supply Net Billable kWh while the Delivery Net Billable kWh will equal Total kWh.
  • kWh No - (Monetary Value Netting): This method coverts your excess generation into monetary credits based on current pricing. Excess Monetary credits are carried over to the next bill to be applied to the supply section.
Rebates Offered
1
Deregulated
1
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
2
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Tap Criteria
  • NO LST IN UTILITY OWNED EQUIPMENT
  • Insulation -piercing connectors are NOT permitted
  • No tap boxes
  • Remove ground from disconnect to POI for line side tap. provide bonding jumper in disconnect
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Size Justification
Load Justification
Offset Calc Tool
Utility Tool

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
Meter Spot Required
0
Allowed Meter Adapter
Tesla Backup Switch

Plans & docs

Site Plan Reqs
  • Include full name, including initials if required

AC Disconnect:

  • Must be NEMA 3R outdoor rated and mounted near utility meter.
SLD Reqs

All Projects

AC Disconnect

  • Electrically, the switch should be located between the output of the inverter and the Ameren Illinois system. Typically, the switch will be located between the inverter and a circuit breaker or fuse located in the main distribution panel.
  • The switch must have a visibly open gap between the switch contacts, knife-blade type. Circuit breakers are NOT suitable for this purpose.
  • The switch must be able to be locked in the open position.
  • Label AC disconnect as:
  • If its PV project: PV AC disconnect , lockable, properly labeled, and accessible 24/7
  • if its a PV+ ESS project: PV/ESS AC disconnect , lockable, properly labeled, and accessible 24/7

Battery Projects

  • DC Coupled Batteries ONLY. Ameren does not allow AC Coupled batteries (Tesla and SolarEdge are DC coupled, Enphase = AC Coupled)
  • DC disconnect between BUI and energy bank.
  • AC disconnect between inverter and BUI required.
  • Battery Projects with a whole home backup, or Main Panel Insert where we have to cut the conductors, require an MPU with Meter Lever Bypass and a solo main breaker.
Electric Service Reqs

If intercepting the meter for an MBE/MPI/BUI/Or Gateway, the utility will require a lever bypass meter with main breaker (Escalate to ER if these exist)

  1. When showing lever bypass meter on the plans show main breaker in the enclosure as well (please size this breaker accordingly to site conditions).
  2. Example: staff (557489)
  3. IF PERMITS ARE NOT REQUIRED IN THE AHJ, THE ABOVE WILL NOT BE REQUIRED.

IF USING SUMMATION RULE AS POI WE ARE TO

  • Provide clear labeling of all breakers in the MSP on the ELD.
  • This does not apply to the 120% rule per email with inspector
Placards


Electrical Stamp Required
0
Meter Num Req SLD 3LD
1
ESID Num Req SLD 3LD
0
Site Plan Notes


Label Page Notes


Cover Page Notes


Electrical Diagram Notes

LST [Line Side Tap suitable for use on the line side of service equipment.]

All Jobs [The PV/ESS AC disconnect is within 10 feet of the utility meter and is lockable, labeled, and accessible 24/7.]

Battery [PV RAPID SHUT DOWN COMPLIES WITH ASM 1500.01(6), ASM 1500.02(6), AND ASM 1500.01(8) // UTILITY METER WILL BE REPLACED TO NEW LEVER BYPASS METER]

Rate Schedule Link
link
Website
link
Phone
(800) 755-5000

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
0
Address ID
108078
Express Planset Eligible
Yes