City Of Batavia Electric (IL)
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
Call out Production meter as "(N) MILBANK
U5929-XL-INS
SINGLE PHASE
NEMA 3R
600V/100A
FORM 2S
PV PRODUCTION METER"
Confirmed with staff.
- Electric Service Reqs
Residential projects should be less than 10 kW.
- Install Reqs
Prior to COB energizing the service, the non-islanding abilities of the customer's inverter will be tested and verified by COB personnel.
- Placards
The customer must install a warning label on the service meter enclosure and transformer cabinet/disconnect stating the following:
Warning - Electrical Shock Hazard Do Not Touch Terminals. Terminals On Both The Line And Load Sides May Be Energized In The Open Position.
- Rate Schedule Link
- link
- Website
- link
- Phone
- (630) 454-2350
Other details
- Restrict Inspection
- 0
- Address ID
- 111262
- Express Planset Eligible
- Yes