City of Roodhouse
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Energy generated by the customer-owned generator during the billing period may supply all or a portion of the energy required by the customer's load. The customer shall be credited for excess energy delivered by the customer to the City at the meter from the approved facility. Customer will be credited at the avoided cost (avoided cost amount unavailable)
- Rebates Offered
- 0
- Deregulated
- 1
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Systems must be properly sized to not exceed the customers expected annual usage based on current needs of the customer. Energy usage will be analyzed using the last 36 months of energy usage (if available) to calculate the customer expected annual usage.
If the customer provides documentation specifying why the usage has increased over that time, such as home renovation/addition or installation of electric heating of an EV charging station, then the previous 12-month period shall be used to determine the average for the expected annual usage.
If the applicable months of data are not available for an individual customer, the average usage amounts by other similar customers of the utility, as determined by the utility, shall be used to set the expected annual usage.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
Plans & docs
- Site Plan Reqs
Standard (not required for interconnection)
- SLD Reqs
Standard - see example uploaded to files
- Electric Service Reqs
IEEE 1547
IEEE 519-2014
IEEE 1453
UL 1741
NESC
ANSI/NFPA 70
OSHA
- Install Reqs
AC Disconnect Required, must be 24/7 readily available and lockable
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
Other details
- Express Planset Eligible
- Yes