Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Coles-Moultrie Electric Cooperative

Illinois Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed1
Line Taps Allowed0
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

10 kW and LESS: the Cooperative shall calculate a monetary credit for such excess generation at the same interval of time at a rate as defined by the HMEV. Such credit shall be applied to the first available monthly bill. Credits shall not be carried over past the first available month

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
0
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

STRICT 10kW AC CAP

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

SLD Reqs

Line-side Taps/SST are NOT allowed in this utility.

Install Reqs

STRICT 10kW AC CAP

Rate Schedule Link
link
Website
link
Phone
(217) 235-0341

Other details

Restrict Inspection
1
Revision Required
1
Address ID
1115227
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Coles-Moultrie Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.