Corn Belt Energy Corporation
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.051
- Solar Export Value Notes
- Changes annually or as needed
- Net Excess Generation Notes
If the amount of electricity produced by the Member exceeds the amount of electricity used by the Member during any point in time, the cooperative will provide a bill credit in an amount equal to .051 $/kwh for each kilowatt of energy supplied to the Cooperative. The rate will be evaluated annually corresponding with changes to energy and demand costs of the cooperative.
This bill credit will sum during the Applicable Billing Period and be provided as a credit to that bill. In the event the credit exceeds the Members cost of energy for the Applicable Billing Period the Minimum Monthly Charges will apply.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 1
- Load Taps Allowed
- 0
- Tap Criteria
- Please note that we do not allow floating type connectors to be used, including taps in the MSP or meter can, an exterior mounted accessible disconnect needs to be added, and finally the meterbase will need to be a lever-by-pass style.
- Taps must be in a tap box
- Taps required unprotected production meter which comes before the fused disconnect
- See "Tap Example" in files section below
- Any MPU, sub panel, or tap will require a whole house disconnect
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Size Justification
- Load Justification
- System Offset Notes
Net Metering is only allowed up to 25kW
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- Situational
- Production Meter Criteria
- Over 25kW requires production meter
- Taps require an unprotected production meter which comes before the fused disconnect
- Meter Spot Process
Temporary Disconnect Reconnect Process (TDR) Call our office at to schedule this disconnect. Please allow a day or two for scheduling purposes. At this time there are no costs for the TDR.
TDR - Who to
TDR - Applications/Documents Req N/A
TDR - ETA of notice required for request 2 days
TDR - Who can schedule? Does not matter
TDR - ETA of Utility Scheduling TDR N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
All Jobs
- Detailed one-line diagram of the proposed facility, all applicable elementary diagrams, major equipment, (generators, transformers, inverters, circuit breakers, protective relays, etc.) DER Samples Attached
- Electric Service Reqs
Any MPU, sub panel, or tap will require a whole house disconnect
- Install Reqs
Utility will set the meter into the meterbase. They do not allow floating connections such as insulating piercing connectors nor Polaris type lugs to be used.
Utility Inspection Required
- Rate Schedule Link
- link
- Website
- link
- Phone
- (800) 879-0339
Other details
- Restrict Inspection
- 0
- Address ID
- 358684
- Express Planset Eligible
- No