Shelby Electric Cooperative
Net Metering Allowed0
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.033
- Solar Export Value Notes
- Changes annually and will be posted on their website
- Net Excess Generation Notes
You will be billed for all kilowatt hours delivered to your premises. All kilowatt hours received back to SEC will purchased at $0.033 / kWh (2025 rate). Rate changes annually and will be posted on their website (it is possible that it'll change in the middle of the year as well)
- Rebates Offered
- 1
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 50
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 110
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- System Offset Notes
50 kW AC or 110% offset of their historical usage, whichever is less.
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- AC disconnect is required to be accessible by the utility 24/7
- SLD Reqs
- AC disconnect required
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- (800) 677-2612
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 1319332
- Express Planset Eligible
- Yes