Belmont Municipal Light Department

Massachusetts Utility Interconnection & net metering rules
Net Metering Allowed0
NEM TypeN/A
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredNo

Net metering & export

Net Metering Allowed
0
NEM Type
N/A
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Fixed kWh
Solar Export Rate
0.13
Solar Export Value Notes
Rate changes as needed, current rate can be found in their website
Net Excess Generation Notes

Belmont Light will purchase all Excess Energy metered by Belmont Light at a fixed rate - current rate can be found on their website.

Rebates Offered
0
Deregulated
1
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
20
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
No
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

One-line diagram showing facility interconnection, main utility metering and any premises sub-metering. One‐line diagram and data sheets indicating IEEE 1547 /UL1741 listing. Documentation for inverters, panels, batteries, or other applicable equipment must be submitted

Electric Service Reqs

Belmont Light’s distribution circuits generally operate with automatic re‐closers, which activate following a trip without regard to whether the Facility is keeping the circuit energized. The Interconnecting Customer is responsible for protecting their equipment from being re‐connected out of synch with Belmont Light's system. For Facilities that utilize photovoltaic (PV) technology: It is required that the system be installed in compliance with IEEE Standard 929‐ 2000, “IEEE Recommended Practice for Utility Interface of (PV) Systems” or the applicable updated standard. The inverter shall meet the Underwriters Laboratories Inc. Standard UL 1741, “Static Inverters and Charge Controllers for Use in PV Power Systems” or the applicable updated standard.

Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
1
ESID Num Req SLD 3LD
0
Website
link
Phone
(617) 993-2800

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
126605
Express Planset Eligible
Yes