CELD - Chicopee Electric Light

Massachusetts Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Other
Net Excess Generation Notes

The kilowatt hours produced by the generator will be credited against the corresponding On/Off peak usage at the rate for that customer-generator’s current class of service. If the customer produces more energy than it uses for the month, the customer will be credited on its bill for the excess generation at the full retail rate and the credit will be carried over to the following billing period.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
Production Meter Labeling
Production Meter
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • Production meter to be labeled as "CEL owned production meter"
SLD Reqs

Relay Meter Orientation = Over/Under


  • Production meter wired with the bottom facing the Line/Utility and the Top facing Generation (PV).
  • Production meter to be labeled as "CEL owned production meter"
Electric Service Reqs

Requirements vary by location and are addressed during the Preliminary Review Process

Website
link
Phone
(413) 598-8311

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
126670
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with CELD - Chicopee Electric Light before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.