MASS ACA - Net Metering Cap Allocation
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- Yes
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- No
Interconnection & taps
- Approval Req To Install
- No
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
- Cap Allocations provided to proposed solar facilities authorize Net Metering Services up to the KW DC-STC capacity requested in an Application for Cap Allocation. The Cap Allocation (or impact against the Cap) provided to solar facilities is calculated at 0.8 x KW DC-STC, per the Section 5(B) of the System of Assurance of Net Metering Eligibility, a value set by the Massachusetts Legislature.
β’ Cap Allocation: 0.8 x KW DC-STC
β’ Authorization To Build: KW DC-STC (equal toπΆππ π΄ππππππ‘πππ
0.8)
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Website
- link
- Phone
- (877) 357-9030