North Attleborough Electric Department
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correctionNet metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- No
- Deregulated
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Supply Side Taps Allowed
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- Yes
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Percentage
- Offset Value
- 90
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
The AC nameplate rating of the Facility may not exceed 90% of Customer’s highest demand peak (as determined solely by NAED) for the twelve month period preceding the date on which Customer signs the Application set forth in Attachment 1 and each anniversary thereof or 500 kW, whichever is lower;
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
An electrical one line diagram or sketch showing major pieces of equipment and how they will be interconnected relative to the service entrance panel and electric revenue meter
- Electric Service Reqs
As-Built Drawings: Before service commences under this Tariff and before the Facility may be energized, Customer shall provide NAED with an as-built drawing of the Facility
- Website
- link
- Phone
- (508) 643-6300