Paxton Light Municipal Department

Massachusetts Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Customer-generators served under the "Residential Rate" are limited to a rated system capacity of 10 kW (DC), not to exceed 80% of the customer's average load. The average load will be determined by the most recent 12 months of billing history.

PMLD shall furnish and install a meter capable of Bi-Directional metering.

PMLD will measure the amount of kWhs received and delivered, on a monthly basis. The customer will be billed at the rate applicable to their electric customer's class of service for all the kWhs delivered from PMLD and they will be credited at the Wholesale Energy Rate for all kWhs, not used by the customer, returned to the PMLD system. These credits shall be used to offset the customer's current monthly bill. Any remaining credits will be carried over to subsequent months.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Maximum peak output of the generating installations covered by this policy is 10 kW (DC).

Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

An electrical one-line diagram or sketch depicting how the inverter will be interconnected relative to the service entrance panel and the electric revenue meter. The diagram must show all devices for the system, including equipment ratings, wire sizes and a visible accessible and lockable disconnect switch (“safety switch”). The disconnect switch must be installed in a readily accessible location normally within view of the PMLD revenue meter, where utility personnel can operate the switch if required.

Electric Service Reqs

refer to pg 9-11 in Guide to Solar

Website
link
Phone
(508) 756-9508

Other details

Restrict Inspection
0
Address ID
124857
Express Planset Eligible
Yes