Great Lakes Energy Cooperative
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.056
- Net Excess Generation Notes
The Customer shall be credited 5.6 cents per kwh, for Excess Generation. Energy produced by the Customer’s solar or wind renewable energy generator and consumed at the Customer’s location without flowing onto the Cooperative’s distribution system is not billed by the Cooperative, compensated by the Cooperative, or displayed on the billing statement. The Customer shall pay the full retail rate in accordance with the Cooperative’s standard service tariff applicable to the Customer for energy delivered to the Customer by the Cooperative. Any credit that is not used up during the current billing period shall be carried forward for use in subsequent billing periods.
** The Net Metering agreement lasts for 10 years from the date of PTO
- Rebates Offered
- 0
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
The size of the system is limited to the load requirement at the member’s property with an absolute maximum of 20 kW
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Site plan example uploaded to files
- SLD Reqs
SLD example uploaded to files
- Install Reqs
AC Disconnect is required
- Required to be in a lockable box that is easily visible and identifiable for the utility to access
- Placards
Utility does not have specific placards. Follow current NEC code for placard examples
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
Other details
- Mod Swap Requires Planset
- 1
- Express Planset Eligible
- Yes