Indiana Michigan Power
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.11375
- Net Excess Generation Notes
The customer will be credited on outflow for the billing period or time-based pricing period. The credit shall be applied to the current billing month and shall be used to offset charges on that bill. The credit shall not offset the customer service charge. Any excess credit not used will be carried forward to
subsequent billing periods. Unused outflow credit from previous months will be applied to the current billing month, if applicable. Outflow credit is non-transferable. (credit rate for excess generation is $0.11375)
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 110
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
- System Offset Notes
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
Plans & docs
- Site Plan Reqs
- Electric Service Reqs
- The utility requires a minimum of 200A service.
- Customer-Owned Meter Socket Specifications: Enclosure Construction (aepnationalcustomers.com) (Production Meter is not required in the state of Michigan)
- Requirements for Electrical Service: Requirements For Electrical Service (aepnationalcustomers.com)
- Install Reqs
- Area shall be cleared of obstructions 15" on each side and 48" in front of meter
- Entrance and exit conduits shall be installed using the knockout holes provided by the manufacturer
- Production Meters are not required in Michigan per AEP
- Area surrounding the current electrical meter up to 2 feet in all directions
- Placards
- Must follow NEC standard placard requirements
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
Other details
- Restrict Inspection
- 0
- Express Planset Eligible
- Yes