Grand Rapids Public Utilities
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Annual
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Roll-over credit: excess kWh will roll-over to the next billing period until the end if the annual period (March 31). After the annual period, if there are any remaining kWh, they will not be compensated and will be zeroed out. Average Retail Rate: utility will purchase excess kWh at the end of each monthly billing period. Credit (monetary value) can be used on the next billing period or the utility can send a check to the customer.
- Rebates Offered
- No
- Deregulated
- No
- Allows Standby
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
System size & offset
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Plans & docs
- Placards
- Website
- link
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes