Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.097
Solar Export Value Notes
$0.108/kWh (Urban); $0.097/kWh (Rural)
Net Excess Generation Notes

When the energy generated by the qualifying facility exceeds that supplied by the Utility to the customer at the same site during the same billing period, the Utility shall compensate the qualifying facility for the excess energy at the average retail Utility energy rate. ($0.11/kWh)

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
20
System Size Restriction Type
AC kW

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Website
link
Phone
(651) 345-4711

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
16421370
Express Planset Eligible
Yes