Minnesota Power
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The Seller shall be billed according to the Company’s applicable standard rate schedule for the energy (kWh) supplied by the Company that exceeds the
amount of energy supplied by the Seller to the Company’s distribution system during each billing period. 11.59¢ per kWh of Net Energy - Residential Customers
- Rebates Offered
- 1
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- MPU Rules
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
The 120% offset rule does not apply to systems under 40 kWac if the customer is not applying for the rebate.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Process
"the meter socket must always be upgraded to lever bypass as a minimum".
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
SLD must include the following
- Interconnection Customer name.
- Application ID (or, if applicable, Customer account number (utility bill account number))
- Installer name and contact information. x Install address- must match application address.
- Correct positions of all equipment, including but not limited to panels, inverter, and DC/AC disconnect. Include distances between equipment, and any labeling found on equipment.
- This one-line diagram must be signed and stamped by a Professional Engineer licensed in Minnesota if the DER is larger than 50 kW (if uncertified) and 250 kW (if certified.)
- Electric Service Reqs
National Electrical Code (NEC)
Institute of Electrical and Electronics Engineers (IEEE 1547)
Minnesota Statute 216B.164
Minnesota Rules Chapter 7835 and electric utility requirements
- Install Reqs
Production Meter:
- Minnesota Power requires that all distributed generation customers install a production meter within 10 feet from the existing service meter
- Production meter sockets cannot be attached to any Minnesota Power owned facilities such as a pole or meter pedestals
AC Disconnect:
- AC disconnect cannot be attached to any Minnesota Power owned facilities such as a pole or meter pedestals
- Placards
All signage and labelling shall be in accordance with the NEC
AC Disconnect
- The Utility AC disconnect shall be labeled as “DER Utility AC Disconnect”
- If a single Utility AC Disconnect cannot be used to disconnect all DERs, all Utility AC disconnects should include numerical identification such as “Utility DER AC Disconnect 1 of 2” or similar. The number of disconnects required to be operated to isolate the DER from the utility should be clear.
Main Meter
- A sign at the main service meter shall indicate that DER is present. Each type of DER present shall be listed. The sign shall provide clear direction to the distance and location of all DER utility AC disconnects. A map shall include outline of all structures in the area and compass arrow for orientation.
- the meter socket must always be upgraded to lever bypass as a minimum.
Production Meter
- The production meter shall be labeled as “Production Meter”
Equipment Variances
- Any systems that have been granted a variance for equipment locations shall have installed pictorial placards showing location of all associated equipment at each location where equipment is located.
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Electrical Diagram Notes
ALL JOBS [AC Disconnect is within 10' ft of the general service meter socket. AC Disconnect is fused, lockable, visible and readily accessible // meter socket is level bypass]
- Website
- link
- Phone
- (800) 228-4966
Other details
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 7184563
- Express Planset Eligible
- No