Shakopee Public Utilities
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
When the energy generated by the qualifying facility exceeds that supplied by the Cooperative during a billing period, the Cooperative shall apply the excess kilowatt hours as a credit to the next billing period kilowatt hour usage. Excess kilowatt hours that are not offset in the next billing period shall continue to be rolled over to the next consecutive billing period. Any excess kilowatt hours rolled over that are remaining at the end of each calendar year shall cancel with no additional compensation.
** Net metered customers have the option to receive a refund check mailed to them with any monthly credit billing. This credit can also remain on the customer’s account offsetting the next billing period charges. This preference is selected at the time of interconnection installation.
- Rebates Offered
- 1
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 40
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
For non-rebate projects: 40 kW AC with no offset requirement
Solar Rebate Requirements:
- Total system size does not meet a minimum of 2kW
- Systems annual energy production does not exceed 120% of prior annual usage
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
Plans & docs
- SLD Reqs
Standard
Rebate Requirements:
- SPU reserves the right to prorate the available rebate when a system -
- is shaded permanently by nearby trees, or
- is not 100% oriented at an azimuth between 120º and 240º
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- (952) 345-2476
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 8733341
- Express Planset Eligible
- No