Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Carthage Water and Electric Plant (CWEP)

Missouri Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If the electricity generated by the customer-generator exceeds the electricity supplied by Carthage Water & Electric Plant during a billing period, the customer-generator shall be billed for the appropriate customer charges for that billing period and shall be credited an amount at least equal to the avoided fuel cost of the excess kilowatt-hours generated during the billing period, with this credit applied to the following billing period

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Website
link

Other details

Address ID
18040274
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Carthage Water and Electric Plant (CWEP) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.