Carthage Water and Electric Plant (CWEP)
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- Yes
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If the electricity generated by the customer-generator exceeds the electricity supplied by Carthage Water & Electric Plant during a billing period, the customer-generator shall be billed for the appropriate customer charges for that billing period and shall be credited an amount at least equal to the avoided fuel cost of the excess kilowatt-hours generated during the billing period, with this credit applied to the following billing period
- Rebates Offered
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Plans & docs
- Website
- link