Carthage Water and Electric Plant (CWEP)
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If the electricity generated by the customer-generator exceeds the electricity supplied by Carthage Water & Electric Plant during a billing period, the customer-generator shall be billed for the appropriate customer charges for that billing period and shall be credited an amount at least equal to the avoided fuel cost of the excess kilowatt-hours generated during the billing period, with this credit applied to the following billing period
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
Plans & docs
- Website
- link
Other details
- Address ID
- 18040274
- Express Planset Eligible
- Yes