Dominion Energy (NC)

North Carolina Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
Yes
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Once the final interconnection notification form is approved, the customer’s 12-month net metering period begins. The energy your renewable energy generator produces will offset the energy you would normally purchase from Dominion Energy.

If you generate more electricity than is needed for your home or business in a given billing period, the amount will be credited to your account to offset the cost of future electricity you receive from Dominion Energy. The billing period credit is accumulated, carried forward and applied at the first opportunity to any billing periods in which you have positive net consumption. Please note that even if a credit is issued, the customer will still receive a bill each month with basic monthly charges.

Rebates Offered
No
Deregulated
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
Yes

System size & offset

System Size Restrictions
20
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

Residentials can only go up to 20kw and they can offset a 100% of the electricity generation. I will review that last 12 months of the customers usage to determine approval. I will let you know if there are any issues.  

The "Residential Infomation Sheet" required for any customer that has less than 7 months of electric usage.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

See SLD Requirements

SLD Reqs
  • Production Meter must be wired like this: Inv > bottom of PM > AC Disco > POI. (.)



Complete “Single Line Diagram” document in the Files section of this page. Follow instructions in the "Note" section.


1. If required, a Non-Utility Meter Socket may be installed between the PV Modules and the Co-Gen Meter Socket. 2. The PV Disconnect shall be load break rated and shall provide a visible air gap and be lockable in the off position. Locate immediately adjacent to the service meter. It must be accessible to the power company personnel 24/7. 3. Specify the point of common Coupling for the solar and existing house wiring. Check box if Main Service Panel is located indoors.


Energy Storage System

Utility requires a single visible-break AC Disconnect to isolate both the PV and batteries.

Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Rate Schedule Link
link
Website
link
Phone
(866) 366-4357

Other details

Revision Required
No
Mod Swap Requires Planset
Yes