Energy United
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.0334
- Net Excess Generation Notes
Option A - (FULL RATE) Energy Credits shall be based on the kilowatt hours delivered to
the Cooperative for the month a bill is rendered times the Energy Charge specified in the rate schedule under which the customer is currently receiving service.
Option B - (AVOIDED COST)Energy Credits shall be based on the kilowatt hours delivered to the Cooperative for the month a bill is rendered times the applicable Avoided Cost rate specified in the Cooperative’s Rate Schedule AC.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Residential members participating in EnergyUnited’s Net Metering program are limited as follows: for Option A, systems shall be no larger than 10 kW AC or the member’s peak demand, whichever is less, and for Option B, systems shall be no larger than 25 kW AC or the member's peak demand, whichever is less. N
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Meter Spot Process
TDR Process Call office, no fee is required unless it is after hours.
TDR - Who to
TDR - Applications/Documents Req N/A
TDR - ETA of notice required for request 36 hours
TDR - Who can schedule? Customer/ Does not matter
TDR - ETA of Utility Scheduling TDR N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
There is no separate production meter required. All of our residential meters are programmed with a 2nd register for reverse power, so the meter does NOT need to be changed after installation.
A one-line diagram of the system showing the main components and metering of the system, including the external AC disconnect switch
- Install Reqs
Member shall install a manual load-break disconnect switch with a clear visible indication of switch position between Cooperative’s electric system and Member’s Generator. The Isolation Device shall be installed as specified in the Interconnection Standard.
Utility Inspection Required
- Placards
Member will install a permanent warning label on the meter base to notify them personnel that there is a generator installed on the load side of the meter. The warning label shall not be placed in a location that would interfere with the ability of Cooperative personnel to read the electric meter.
Member shall also place a warning label on the Isolation Device. Cooperative will provide the warning labels to Member. The warning labels must be in place before the Generator can be interconnected with Cooperative’s system.
- Website
- link
- Phone
- (800) 522-3793
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 161399
- Express Planset Eligible
- Yes