Jones-Onslow EMC
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Other
- Solar Export Rate
- 0.05
- Solar Export Value Notes
- $0.05/kWh
- Net Excess Generation Notes
Whatever the excess energy is sent back to us, we pay them $0.05/kWh
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 20
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
Temporary Disconnect Reconnect Process (TDR) Need to call ahead of time so they can check the area. Typically they will be able to go out there before noon.
TDR - Who to
TDR - Applications/Documents Req N/A
TDR - ETA of notice required for request 24 hours
TDR - Who can schedule? Account Holder
TDR - ETA of Utility Scheduling TDR N/A
No transformer upgrades
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
Drawing showing the meter to the system and where the AC Disconnect is located.
- Install Reqs
Customer shall install a manual load-break disconnect switch with a clear visible indication of switch position between JOEMC’s electric system and Customer’s DR. The Isolation Device shall be installed as specified in the Interconnection Standard.
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (910) 353-1940
Other details
- Restrict Inspection
- 1
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 177093
- Express Planset Eligible
- Yes