Piedmont Electric
Net metering & export
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Fixed kWh
- Solar Export Rate
- 0.347
- Net Excess Generation Notes
"Interconnection Charge 25kW or less - $5.00
Interconnection Facilities Charge Over 25kW - $ 10.00 per month
Excess Facilities Charge Over 25kW- 2.0% times Cooperative’s cost of Excess Facilities
Standby Charge Over 25kW- $ 1.75 per kW"
"The nameplate rating of the Renewable Generation must be 25 kW or less.
Excess Energy shall be defined as energy produced by the consumer’s generator that exceeds the energy used by the consumer at any given time, the end result of which would be energy delivered to the Cooperative. In the event that Excess Energy was delivered to the Cooperative at the end of the billing period, the Cooperative will pay the consumer for the amount of Excess Energy delivered at the Energy Credit Rate
Energy Credit:
Excess Energy 3.47¢ per kWh
Renewable Energy Certificates:
For renewable generators served under this Rider, the Cooperative shall have the first right of refusal for any renewable energy certificates (RECs) and any environmental attributes produced as a result of the energy generated by the renewable generation. Payments and/or credits for the RECs and any environmental attributes produced as a result of the energy generated by the renewable generation shall be at the rate stated below. Prior to any payments and/or credits for RECs or any environmental attributes produced, the Renewable Generator must be registered with the North Carolina Utilities Commission using NC-RETS and notification of a REC transfer from NC-RETS must have been received by the Cooperative. Consumers receiving compensation for the RECs from the Cooperative shall not be eligible to participate in NC GreenPower’s renewable generation programs.
Renewable Energy Certificate (REC) Credit:
All RECs per month 1.00 ¢ per kWh
The Cooperative will furnish, install, own, and maintain metering to measure the kilowatthours delivered by the Cooperative to the consumer, and if applicable, the kilowatt demand. The Cooperative will also furnish, install, own, and maintain additional metering equipment to measure the kilowatt-hours delivered from the consumer to the Cooperative. The consumer’sservice may be metered with: (a) a single, bi-directional meter, which records independently the flow of electricity in each direction through the meter; or (b) at the Cooperative’s option, two meters, equipped to prevent reverse registration, one which will measure the energy delivered by the Cooperative to the consumer, and the other which will measure the energy delivered by the consumer to the Cooperative. The Cooperative shall have the right to install special metering and load research devices on the consumer’s equipment and the right to use the consumer’s telephone line for communication with the Cooperative’s and the consumer’s equipment.
"
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
Oversize may be submitted for review if load justification is provided. Oversize does not benefit the customer payback rate.
- System Size Justification
- Load Justification
- System Offset Notes
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
Temporary Disconnect Reconnect Process (TDR) Call the office and they will get it scheduled. We do require an inspection before we re-energize the service.
TDR - Who to
TDR - Applications/Documents Req
TDR - ETA of notice required for request 48 hours
TDR - Who can schedule? Does not matter
TDR - ETA of Utility Scheduling TDR
- Allowed Meter Adapter
- None
Plans & docs
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (800) 222-3107
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 177218
- Express Planset Eligible
- Yes