Roanoke Electric Cooperative
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.03
- Net Excess Generation Notes
The consumer’s service will be metered with two meters equipped to prevent reverse registration, one that will measure any energy delivered by the Cooperative to the consumer, and the other which will measure any energy produced by the consumer’s renewable energy generation system and delivered to the Cooperative
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- No
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Equipment Approvals
- California Energy Commission
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (800) 433-2236
Other details
- Restrict Inspection
- 0
- Address ID
- 177253
- Express Planset Eligible
- Yes