ACE - Atlantic City Electric

New Jersey Utility Interconnection & net metering rules
Net Metering Allowed1
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
TOU Utility
0
Post Solar Billing Method
Net Metering
Rebates Offered
1
Deregulated
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
0
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
1
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Utility Specific Adjustments
  • Request Customer Usage: https://www.atlanticcityelectric.com/SmartEnergy/MyGreenPowerConnection/Pages/RequestCustomerUsage.aspx
  • Load Justification required if the Account Holder does not have 12 Months of Usage
  • Load Justification with PE Stamp required for level two (Over 10kW-AC Nameplate) Submission
  • Capacity map: https://pepco.maps.arcgis.com/apps/webappviewer/index.html?id=98f9fa754c3d4cddaee45bb5d4612549
  • The max system size must be less than the past 12 months consumption found in UBILL.
System Size Justification
Load Justification
System Offset Notes


Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Accessible and Lockable AC Disconnect
Meter Spot Required
0
Allowed Meter Adapter
None

Plans & docs

SLD Reqs
  • RGM inverter is required, not production meter. (For micro inverter jobs: the monitoring system satisfies the RGM requirement)
  • Load calcs required for all projects.
Electric Service Reqs
  • Refer to Electric Service Handbook
Install Reqs
  • ACE installs the net-capable meter
  • AC Disconnect to be installed outside by the utility meter. Must be fully accessible
  • Integrated Revenue Grade meter, installer must be present for any on-site inspection to grant access to RGM which is housed inside of an enclosure of any kind.
Placards

The Generator Owner will install a warning label in a conspicuous place on their electric meter or meter box to notify Company personnel that there is a generator source installed on the load side of the meter. The warning label shall not be placed in a location that would interfere with the ability of Company personnel to read the electric meter. The Company will provide the warning label to the Generator Owner. The warning label must be in place before the generation can be interconnected.

Electrical Stamp Required
0
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(800) 642-3780

Other details

Restrict Inspection
0
Address ID
108142
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with ACE - Atlantic City Electric before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.