LEU - Lavallette Electric Utility

New Jersey Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
Post Solar Billing Method
Net Metering
Solar Export Type
Fixed kWh
Solar Export Rate
0.03
Net Excess Generation Notes

Excess generation paid at about $.03/kWh

Rebates Offered
Yes

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Clear location of Array (if solar), Inverter, and Disconnect  

SLD Reqs

PE Stamped

Install Reqs

Electrical quality must be sixty-herz, alternating current having voltage and phase characteristics acceptable to the Borough of Lavallette Electric Utility. Operation of the self-generating unit shall not result in flicker, voltage fluctuations, interference with electronic equipment, or damage to Borough of Lavallette Electric Utility or customer- owned equipment.  

The System must have a lockable, visible disconnect device, accessible at all times to Borough personnel.  

Website
link
Phone
(732) 793-7766
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with LEU - Lavallette Electric Utility before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.