Orange & Rockland

New Jersey Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Rebates Offered
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • Illustrate and label POI (point of interconnection) on the site plan
  • Utility bill account number is required on the site plan
SLD Reqs
  • RGM inverter is required, not production meter.
Install Reqs
  • Each individual project must have a distinct ANSI c-12 revenue grade meter dedicated to TREC creation.
  • Behind the Meter Systems, the PM must be installed on the side of the transformer that is directly service the building load.
  • Integrated Revenue Grade meter, installer must be present for any on-site inspection to grant access to RGM which is housed inside of an enclosure of any kind.
Electrical Stamp Required
0
Meter Num Req SLD 3LD
1
ESID Num Req SLD 3LD
0
Site Plan Notes


Rate Schedule Link
link
Website
link
Phone
(877) 434-4100

Other details

Restrict Inspection
0
Address ID
134024
Express Planset Eligible
Yes